power poles

Reduce or eliminate the risk and inconvenience of working around overhead power lines in farmyards.

Our primary 25 kilovolt (kV) or 14.4 kV overhead power lines that are located within farmyards can be replaced with safe and convenient underground cables.

Cost-Shared Approach

We'll invest a major portion of the cost to bury or relocate overhead power lines in farmyards. We will invest 75% and all you pay is 25% of the total construction cost to a maximum of $2,000 + GST. Any additional work is subject to costs incurred to customers.

Eligibility

E34 farm rate customers are eligible for the Farmyard Power Line Relocation program. Not sure if you’re a E34 customer? Check on your power bill on the left-hand side under “GST Registration Number” or contact us.

Application Process

Understand the application process before applying.

  1. After receiving your application, our design team will call you and provide a verbal quote within 7 days.
  2. Upon accepting the quote our design team will complete a preliminary design and send a technician out to your site within 7 days.
  3. Once our technician completes his field check, we’ll finish the formal design and send you a quote letter within 2 weeks.
  4. After you accept the quote, we’ll get to work on acquiring all of the permissions we need to do the work. This generally takes approximately 15 to 30 days.
  5. Once all of the permits are obtained your application will be scheduled for construction. This takes approximately 10 to 30 days to complete.

How to Apply

Apply now by using the form below or calling us at 1-888-757-6937 (option 4).

APPLY NOW

Clearance between power lines and property

Installation Details

If your farmyard is eligible, the overhead primary line will be installed underground using the most economical methods, without compromising our construction and safety standards. The existing overhead transformer pole will be replaced with a pad-mounted transformer. You will be responsible for burying any private power lines.

Pole Transfer Agreement

At your request, the existing overhead transformer power pole may be left for your convenience. If your request is approved, we will remove all hardware and you can assume ownership by signing a pole transfer agreement.

Approved Applications

This popular program has a limited annual budget and all applications may not be approved in the same year in which you apply. Approved applications will be carried out subject to annual construction schedules on a first-come, first-paid, first-served basis.
Dart Image
Provide Your Feedback